• Go Beavers!!!

Replacing fiber and adding additioanl runs and required connections on campus.

REQUEST FOR QUOTATION TO: SUBMIT BID TO: Kent Adams Vice President of Finance & Operations Pratt Community College 348 NE SR 61 Pratt, KS 67124-9700 Quotation Number 050817 (Refer to this number in any communication.) Bids are requested on the item(s) listed below. Include any shipping charges in bids. Pratt Community College is accepting bids for replacing fiber and adding additional runs and required connections on campus as described below. The attached map shows in red the fiber runs that are to be added. The red boxes represent the vaults to be installed. The black lines are existing fiber runs to have existing fiber replaced with new fiber. Please provide separate pricing for run A and run B with replacing existing fiber. Project exemption certificates will be provided by PCC. QUANTITY ITEM UNIT PRICE TOTAL Add new fiber and replace existing fiber at PCC Main Campus to allow for 10 gb backbone connections and 1 gb connection to PCC desktops. 24 strand fiber to be utilized Terminate fiber to install in fiber enclosures. New fiber to be run through 3” PVC. Prep and terminate fiber cables as needed. Any other necessary items that may be needed to complete the job. Bore and trench as needed. 3- 30” x 48” x 24” vaults to be installed and fiber connections completed. Performance bond in amount of project will be required prior to project start. Contractor must provide proof of liability insurance with minimum coverage of $1,000,000/$2,000,000 and worker’s compensation coverage that meets Kansas Statutory requirements. If you have any questions contact Kent Adams, Vice President of Finance & Operations at (620) 672-2724. Closing time for bids: 2:00 p.m. on May 8, 2017 Bids will be opened at this time. Interested parties are invited to be present. Pratt Community College reserves the right to accept or reject any or all bid, and to revise any bid specifications. Invoices will be paid within 30 days. Signed by: Title: Firm: Date:

Project Type: 

Closing Time: 

Monday, May 8, 2017 - 2:00pm

Groups audience: